Minimizing the weight and volume in a ship cable plant improves system efficiency or provides the capability to carry more critical payloads. Cabling should be as small as possible. This research developed an approach to the fundamental understanding needed to design, specify, and test cabling that has the minimum prudent size with high reliability. Progress requires a convolution of the failure modes with the thermal, electrical, and mechanical environment in which the cable is operating.

Description

LCSH Subject Headings

Citation

R. E. Hebner, A. L. Gattozzi, S. D. Pekarek, “Performance Assurance for DC Cables for Electric Ships”, ESTS 2015, June 21-24, 2015, Old Town Alexandria, VA.