Show simple item record

dc.contributor.advisorO'Connor, James Thomasen
dc.creatorPeng, Minen
dc.date.accessioned2008-08-28T22:58:08Zen
dc.date.available2008-08-28T22:58:08Zen
dc.date.created2006en
dc.date.issued2008-08-28T22:58:08Zen
dc.identifierb64876457en
dc.identifier.urihttp://hdl.handle.net/2152/2607en
dc.descriptiontexten
dc.description.abstractNot availableen
dc.format.mediumelectronicen
dc.language.isoengen
dc.rightsCopyright is held by the author. Presentation of this material on the Libraries' web site by University Libraries, The University of Texas at Austin was made possible under a limited license grant from the author who has retained all copyrights in the works.en
dc.subject.lcshRoads--Estimates--Texasen
dc.subject.lcshRoads--Texas--Costsen
dc.titleItem-level quantity-based preliminary cost estimating system for highways structures and miscellaneous constructionen
dc.description.departmentCivil, Architectural, and Environmental Engineeringen
dc.identifier.oclc85484448en
dc.type.genreThesisen
thesis.degree.departmentCivil, Architectural, and Environmental Engineeringen
thesis.degree.disciplineCivil Engineeringen
thesis.degree.grantorThe University of Texas at Austinen
thesis.degree.levelDoctoralen
thesis.degree.nameDoctor of Philosophyen


Files in this item

Icon

This item appears in the following Collection(s)

Show simple item record