dc.description.abstractCapital projects use work packaging to divide their projects' scope into manageable portions of work for planning and execution, all to achieve improved productivity and increased predictability. However, currently, no common industry standard for work packaging is widely and uniformly implemented within the North American capital projects industry. As documented by CII RT 272 Phase I (2009-2011), companies have been implementing a number of varied work packaging practices at different stages of the project lifecycle with emphasis on the construction phase. Due to the varied implementation, there is currently little evidence of the benefits of extending work packaging to the Front End Engineering Design (FEED) and the Detailed Engineering (DE) phases. To provide the best current evidence, this thesis describes new findings on Advanced Work Packaging (AWP) as an execution practice, with special emphasis on design activities. This research combines data collection methods such as interviews, observations and document review, as well as surveys. The reader will understand the current industry status on Advanced Work Packaging in terms of levels of implementation as well as evidence of benefits and implementation challenges across the project lifecycle. Documented benefits include productivity improvements on the order of 25% in the field, with corresponding reductions of 10% of total installed cost. Other significant benefits include improved safety, improved productivity, less rework, significant reduction in RFIs and increased stakeholder alignment. Documented AWP implementation challenges include lack of process formulization, persons’ resistance to change and lack of buy-in, stakeholders’ conflict of interest and working culture, incompatibility with some contractual scenarios as well as traditional change management practices.en
dc.format.mimetypeapplication/pdfen
dc.language.isoen_USen
dc.subjectAdvanced Work Packagingen
dc.subjectProductivityen
dc.subjectPlanningen
dc.subjectConstructionen
dc.subjectWorkFace Planningen
dc.titleAdvanced Work Packaging from project definition through site execution : driving successful implementation of WorkFace Planningen
dc.date.updated2013-09-30T22:11:23Zen
dc.description.departmentCivil, Architectural, and Environmental Engineeringen
thesis.degree.departmentCivil, Architectural, and Environmental Engineeringen
thesis.degree.disciplineCivil Engineeringen
thesis.degree.grantorThe University of Texas at Austinen
thesis.degree.levelMastersen
thesis.degree.nameMaster of Science in Engineeringen


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record