TexasScholarWorks
    • Login
    • Submit
    View Item 
    •   Repository Home
    • UT Electronic Theses and Dissertations
    • UT Electronic Theses and Dissertations
    • View Item
    • Repository Home
    • UT Electronic Theses and Dissertations
    • UT Electronic Theses and Dissertations
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Advanced Work Packaging from project definition through site execution : driving successful implementation of WorkFace Planning

    Thumbnail
    View/Open
    HAMDI-THESIS-2013.pdf (27.95Mb)
    Date
    2013-08
    Author
    Hamdi, Olfa
    Share
     Facebook
     Twitter
     LinkedIn
    Metadata
    Show full item record
    Abstract
    Capital projects use work packaging to divide their projects' scope into manageable portions of work for planning and execution, all to achieve improved productivity and increased predictability. However, currently, no common industry standard for work packaging is widely and uniformly implemented within the North American capital projects industry. As documented by CII RT 272 Phase I (2009-2011), companies have been implementing a number of varied work packaging practices at different stages of the project lifecycle with emphasis on the construction phase. Due to the varied implementation, there is currently little evidence of the benefits of extending work packaging to the Front End Engineering Design (FEED) and the Detailed Engineering (DE) phases. To provide the best current evidence, this thesis describes new findings on Advanced Work Packaging (AWP) as an execution practice, with special emphasis on design activities. This research combines data collection methods such as interviews, observations and document review, as well as surveys. The reader will understand the current industry status on Advanced Work Packaging in terms of levels of implementation as well as evidence of benefits and implementation challenges across the project lifecycle. Documented benefits include productivity improvements on the order of 25% in the field, with corresponding reductions of 10% of total installed cost. Other significant benefits include improved safety, improved productivity, less rework, significant reduction in RFIs and increased stakeholder alignment. Documented AWP implementation challenges include lack of process formulization, persons’ resistance to change and lack of buy-in, stakeholders’ conflict of interest and working culture, incompatibility with some contractual scenarios as well as traditional change management practices.
    Department
    Civil, Architectural, and Environmental Engineering
    Description
    text
    Subject
    Advanced Work Packaging
    Productivity
    Planning
    Construction
    WorkFace Planning
    URI
    http://hdl.handle.net/2152/21384
    Collections
    • UT Electronic Theses and Dissertations

    University of Texas at Austin Libraries
    • facebook
    • twitter
    • instagram
    • youtube
    • CONTACT US
    • MAPS & DIRECTIONS
    • JOB OPPORTUNITIES
    • UT Austin Home
    • Emergency Information
    • Site Policies
    • Web Accessibility Policy
    • Web Privacy Policy
    • Adobe Reader
    Subscribe to our NewsletterGive to the Libraries

    © The University of Texas at Austin

     

     

    Browse

    Entire RepositoryCommunities & CollectionsDate IssuedAuthorsTitlesSubjectsDepartmentsThis CollectionDate IssuedAuthorsTitlesSubjectsDepartments

    My Account

    Login

    Statistics

    View Usage Statistics

    Information

    About Contact Policies Getting Started Glossary Help FAQs

    University of Texas at Austin Libraries
    • facebook
    • twitter
    • instagram
    • youtube
    • CONTACT US
    • MAPS & DIRECTIONS
    • JOB OPPORTUNITIES
    • UT Austin Home
    • Emergency Information
    • Site Policies
    • Web Accessibility Policy
    • Web Privacy Policy
    • Adobe Reader
    Subscribe to our NewsletterGive to the Libraries

    © The University of Texas at Austin