Finalizó el traslado de residuos contaminantes de Abra Pampa
Date
2009-01-31
Authors
El Libertario
Journal Title
Journal ISSN
Volume Title
Publisher
Abstract
Department
Description
This article, similar to the other article from the same day entitled “Terminó traslado…Metal Huasi,” describes the announcement that 15,000 tons of lead slag and industrial contamination were removed from Abra Pampa. The waste was deposited in the specially prepared mine owned by the company “Minera el Aguilar.”