| Title: | Tilt-up construction and design evaluation and methodology |
| Author: | Schuldes, Jesus Alberto |
| Abstract: | Tilt-up construction basically involves job-site prefabrication of concrete building members under controlled and relatively economical conditions. This master’s report presents tilt-up design procedures, along with construction procedures and planning at the job-site, erection, finishing and architectural treatments. It is intended to bring together the five steps of design, planning, construction, erection, and finishing which are crucial to a successful tilt-up project. |
| Department: | Civil, Architectural, and Environmental Engineering |
| Subject: |
Tilt-up
Tilt-up construction and design Tilt Tilt up wall construction |
| URI: | http://hdl.handle.net/2152/ETD-UT-2012-05-5098 |
| Date: | 2012-05 |